HMF were called out to look at a requirement & carried out a survey of a new area. The HMF drawing office turned the AutoCAD designs around the next day & HMF were on site the day after installing the racking & associated close boarded decking & column guards.
HMF also fitted anti-collapse mesh to the rear of the pallet racking to prevent impact damage from the fork lift truck onto the external fabric of the building.
Hampshire Mezzanine have completed a number of projects over many years for ICE including mezzanine floor offices as well as racking & shelving installations.
HMF also carry out an annual rack safety survey for ICE to check the condition of their racking & then provide a report of any damage that has occurred, thereby keeping their racking safe.