Telephone: 02380 631 888

Case Studies

To find out more about HMF and the way we work, please click on our case studies. These case studies demonstrate the processes involved with getting your project up and running, from design to construction to completion.

Creation Science Museum

Museum Mezzanine Refurbishment
Hampshire Mezzanine Floors were delighted to be appointed as the Main Contractor for the installation of a new mezzanine floor and refurbishment work at The Genesis Expo Museum in Portsmouth.

Read More


St Johns Ambulance

St Johns Ambulance Have Storage Platform Fitted
St Johns Ambulance in Lymington have recently had a stroage platform fitted by Hampshire Mezzanine Floors.

Read More


Jersey Telecom

HMF Wins Channel Island Project
Hampshire Mezzanine Floors of Southampton won another major refurbishment project for Jersey Telecom.

Read More


Northwood

Northwood Relocation
Northwood, a national lettings company with franchise sites throughout the UK.

Read More


Mellish Precision Engineering

Mezzanine Floor Refurbishment at Mellish
Hampshire Mezzanine Floors were chosen to carry out the new installation of a mezzanine floor, suspended ceilings, office partitioning and shelving at Mellish, to create additional space at first floor level for offices, meeting room, kitchen and storeroom.

Read More


IEC

Mezzanine Floor Supports 2 Tonne Lifting Hoist
Hampshire Mezzanine Floor design a new Mezzanine Floor that can support a 2 Tonne Lifting Hoise as well as storage space.

Read More


Elliotts Builders Merchant

Elliotts Announce New Development in Romsey
Elliotts, Hampshire's leading independant Builders Merchant, are making a major investment at their Romsey premises.

Read More


National Theatre

NATIONAL THEATRE TURN TO HAMPSHIRE COMPANY
Space is a valuable commodity for the National Theatre, and a new two tier mezzanine floor, was installed by Hampshire Mezzanine, behind the Lyttleton Theatre will certainly help to keep the productions rolling. Hampshire Mezzanine formed a two tier structure for storage use which has to be fire rated to comply with Building Regulations requirements.

Read More


SIVA Group

Three Tiers of Success
A Hampshire Company has successfully installed a three tier plant platform for SIVA Group in Southampton over an existing pallet conveyor system. This feat of Project Management and Design was done by Hampshire Mezzanine Floors, the local Mezzanine and Plant floor specialists.

Read More


Storage Platform Mezzanine Floors: Ferryspeed Case

Ferryspeed Case Study
HMF designed a 3-tier mezzanine floor to take advantage of the height of the building. Our customer wanted to use all the available space of the building and our design proved successful in winning the contract.

Read More


CITY ELECTRICAL FACTORS - SWANSEA

40th Refurbishment for Blue Chip Client
Hampshire Mezzanine have recently completed their 40th refurbishment project for the electrical wholesale company, "City Electrical Factors", creating a new Swansea Branch and a suite of offices on the First floor to House their Regional Group office.

Read More


Office Mezzanine Floors: HMF Case Study

HMF Case Study
HMF required additional office space. We already had a first floor office area on an existing mezzanine floor together with an open storage area for archive materials. The existing first floor office area was increased by approximately 65% whilst maintaining extensive stocks of storage equipment below.

Read More


Morgan Electro Ceramics

Morgan Electro Ceramics (MEC) one of the world’s leading manufacturers of technically advanced ceramics have chosen Hampshire Mezzanine Floors to modernise their Southampton factory offices.

Read More


Paragon and ITE Training Group

Education Facility Meets Latest DDA Requirements
Hampshire Mezzanine Floors (HMF) of Southampton carried out the complete fitout of a building for the Paragon and ITE Training Group to comply to the latest Disability Discrimination Act (DDA) and energy efficiency standard.

Read More


Vines BMW based in Guildford

The project involved transforming a bare shell building into a Bodyshop with an extension for spray booths and plant area. HMF designed and built the extension to the building which was carried out out on time and budget.

Read More


BMW Sevenoaks

A refurbishment for BMW dealership at Sevenoaks converting an old showroom into a state-of-the-art dealer specification showroom.

Read More


Request a Quotation Request a Catalogue Links Blog HMF